L&T rises after arm secures significant order to develop BESS project in Gujarat
The contract will be executed collaboratively by L&T?s Renewables vertical and L&T Electronic Products & Systems (LTEPS). Under the scope of the contract, the divisions will develop a three-hour duration BESS facility featuring a power capacity of 300 MW and an energy storage capacity of 900 MWh.
From an operational standpoint, the Khavda installation is engineered to absorb surplus renewable power during peak generation windows and dispatch it back to the grid during periods of high demand. This load-shifting mechanism is expected to optimize clean-energy utilization, reinforce grid stability, and improve overall power supply reliability across India's transmission network.
The advanced BESS solution will incorporate liquid-cooling technology to deliver higher power density, enhanced safety and a longer operating life.
Larsen & Toubro is an Indian multinational engaged in EPC projects, hi-tech manufacturing, products and services, operating across diverse domains and multiple geographies.
The company?s consolidated net profit jumped 26.20% to Rs 5202.10 crore in Q2 FY27 compared with Rs 4687.09 crore in Q2 FY26. Net sales increased 15.84% YoY to Rs 78,749.94 crore in the quarter ended 30th September 2026.
Powered by Capital Market - Live News