Va Tech Wabag bags two waste water treatment projects
The scope includes the Design, Engineering, Procurement, Construction and Commissioning (EPC) of the wastewater treatment facilities along with biogas-based power generation. The STPs will be based on the Activated Sludge Process integrated with a Biological Nutrient Removal system. The TTP at Byramangala will utilize Ultrafiltration to produce high-quality treated water suitable for distribution to surrounding water bodies. It is worth noting that, WABAG had previously executed the first phase of the Bellandur facility and has now been awarded the second phase as well. The EPC scope of the facilities is scheduled for completion within 36 months, followed by a 7-year Operations and Maintenance (O&M) period, during which WABAG will ensure efficient and reliable plant performance.
The Wastewater Treatment facilities at Byramangala and Bellandur will significantly strengthen Bengaluru's wastewater treatment and water infrastructure, addressing the city's growing challenges arising from rapid urbanization. The facility will incorporate anaerobic sludge digestion with biogas based captive power generation, reducing greenhouse gas (GHG) emissions, lowering the plant's energy footprint, enhancing operational efficiency, and promoting resource recovery. By integrating the treatment technologies with renewable energy generation, the project will support Bengaluru's long term water security while advancing its sustainability and circular economy objectives.